黄色一级录像片,97视频在线,潜伏电影在线观看免费观看完整版,国产真实自拍,影音先锋在线播放资源,中文字幕一二三,日批视频在线看

Strengthening

Location:Home>Strengthening

Structure monitoring system of Chongqing Nanji Gate rail bridge
2024-07-04 11:32:00

 Nanji Gate Rail Bridge is the first large-scale use of steel spring floating plate ballast in China. When the train passes over the bridge at high speed, the integral ballast of the steel spring floating plate can not only reduce the noise of the train, but also reduce the vibration of the bridge floor. The monitoring system monitors the vibration, main beam stress and environmental load of the bridge in real time.  


111.jpg 

Chongqing Nanji Gate rail bridge